We install deadhung theatrical or studio lighting pipe grids of all shapes and sizes.

Although pipe grids can vary with every project, a basic pipe grid is comprised of #40 1-1/2" steel pipe battens in two levels. The upper level or primary pipe is usually suspended from building structure. The lower level or secondary pipe is attached to the upper pipe battens with grid cross connectors. Though the spacing of the battens can be adjusted to your specific needs, a good, versatile average is 4' x 4'. If possible, the grid should be secured to the walls to prevent lateral movement or for stabilization. 

Our pipe grid packages represent some of the most frequently requested grid sizes, but we can price any custom grid size or grid configuration you need. Simply contact our sales department with your specifications for pricing.

Pipe Grid Packages

Click to zoom

Theatrical or Studio Lighting - Pipe Grid Packages include the following:

  • 4’ x 4’ Matrix
  • #40 1-1/2" Steel Pipe - Matte Black Pipe
  • Pipe cut to size as indicated in the package
  • Splices as indicated
  • Grid cross connector clamps (every member around perimeter, every other member on grid interior)
  • 4 Wall stabilizers or wall flanges for corners. Extras can be added to the package as needed.
  • Suspension point placement is based on a point every 7' OC, and includes (1) pipe clamp and (1) turnbuckle per point. Additional suspension hardware can be added based on your specifications.

Note:  Pipe grid packages include pipe lengths up to 21'. If you cannot maneuvre 21' lengths in your space, pipe can be supplied at shorter lengths (specified by you). Additional splices will have to be added.

Call or Email today for current pricing!

Pipe Grid Package - 20' x 20'

Package includes the following components:

(6) @ 20'   -  Primary Pipe - Matte Black Pipe
(6) @ 20'   -  Secondary Pipe - Matte Black Pipe
No Inner Sleeve included in this package*
(20)  Grid Cross Connectors - Perimeter
(8)  Grid Cross Connectors - Interior **
(24) Pipe Clamps***
(24) Turnbuckles 3/8" x 6" Jaw&Jaw***
(4) Wall Stabilizers ****

*  If shorter pipe sections are needed, ADD SPLICES
**  Every other member
***  Based on hanging assemblies 7' o/c
****  Can be substituted with wall flanges, one at each corner

Pipe Grid Package - 20' x 30'

Package includes the following components:

(6)   Primary Pipes - (21' + 9') - Matte Black Pipe
(9)   Secondary Pipe - (20')   Matte Black Pipe
(6)  Inner Sleeve Splices*
(26)  Grid Cross Connectors - Perimeter
(14)  Grid Cross Connectors - Interior **
(36)  Pipe Clamps***
(36)  Turnbuckles 3/8" x 6" Jaw&Jaw***
(4)  Wall Stabilizers ****

*  If shorter pipe sections are needed, ADD SPLICES
**  Every other member
***  Based on hanging assemblies 7' o/c
****  Can be substituted with wall flanges, one at each corner

Pipe Grid Package - 30' x 30'

Package includes the following components:

(9)   Primary Pipes - (21' + 9') - Matte Black Pipe
(9)   Secondary Pipe - (21' + 9')   Matte Black Pipe
(18)  Inner Sleeve Splices*
(32)  Grid Cross Connectors - Perimeter
(24)  Grid Cross Connectors - Interior **
(54)  Pipe Clamps***
(54)  Turnbuckles 3/8" x 6" Jaw&Jaw***
(4)  Wall Stabilizers ****

*  If shorter pipe sections are needed, ADD SPLICES
**  Every other member
***  Based on hanging assemblies 7' o/c
****  Can be substituted with wall flanges, one at each corner

Pipe Grid Package - 30' x 40'

Package includes the following components:

(9)   Primary Pipes - (21' + 19') - Matte Black Pipe
(11)   Secondary Pipe - (21' + 9')   Matte Black Pipe
(20)  Inner Sleeve Splices*
(36)  Grid Cross Connectors - Perimeter
(21)  Grid Cross Connectors - Interior **
(63)  Pipe Clamps***
(63)  Turnbuckles 3/8" x 6" Jaw&Jaw***
(4)  Wall Stabilizers ****

*  If shorter pipe sections are needed, ADD SPLICES
**  Every other member
***  Based on hanging assemblies 7' o/c
****  Can be substituted with wall flanges, one at each corner

Pipe Grid Package - 40' x 40'

Package includes the following components:

(11)   Primary Pipes - (21' + 19') - Matte Black Pipe
(11)   Secondary Pipe - (21' + 19')   Matte Black Pipe
(22)  Inner Sleeve Splices*
(40)  Grid Cross Connectors - Perimeter
(40)  Grid Cross Connectors - Interior **
(77)  Pipe Clamps***
(77)  Turnbuckles 3/8" x 6" Jaw&Jaw***
(4)  Wall Stabilizers ****

*  If shorter pipe sections are needed, ADD SPLICES
**  Every other member
***  Based on hanging assemblies 7' o/c
****  Can be substituted with wall flanges, one at each corner

Pipe Grid Package - 50' x 50'

Package includes the following components:

(14)   Primary Pipes - (21' + 21'+ 8') - Matte Black Pipe
(14)   Secondary Pipe - (21' + 21' + 8')   Matte Black Pipe
(56)  Inner Sleeve Splices*
(52)  Grid Cross Connectors - Perimeter
(72)  Grid Cross Connectors - Interior **
(126)  Pipe Clamps***
(126)  Turnbuckles 3/8" x 6" Jaw&Jaw***
(4)  Wall Stabilizers ****

*  If shorter pipe sections are needed, ADD SPLICES
**  Every other member
***  Based on hanging assemblies 7' o/c
****  Can be substituted with wall flanges, one at each corner

Call or Email for Current Pricing

Related Projects


Rogar Studios
Installation of two 100’ x 50’ pipe grids using a total of 5000’ of pipe at Rogar Studios in Amityville, NY. The studios are used to produce the new and popular PBS children's series Dittydoodle Works.
TV Guide Studios - NYC

iWeiss installed a 4' x 4' pipe grid, curved aluminum I-beam track, and a black commando and chroma key green cyc.


 

DePaul University

iWeiss had the pleasure of providing automation, rigging, and curtains for the newly constructed Theatre School at DePaul University in Chicago IL.   The scope of the work included 18 multi-purpose studios outfitted with pipe grids with perimeter curtains tracks, a black box theatre, a single level lobby pipe grid, and a thrust theatre with 25 axis’ of automation manufactured and controlled by Stage Technologies.   Acoustical clouds designed and built by iWeiss, variable acoustical curtains, manual rigging, and a complete stage curtain package were also part of the project.


The job had a total duration of 23 months from start to finish with multiple trade coordination from the first concrete pour until opening. We are proud to have been involved with this project and to be a part of the education that DePaul will be able to provide to their students with this new building.


See More at:  http://blog.iweiss.com/


See More Photos on You Tube




The Boston Conservatory

The Boston Conservatory has undertaken a complete renovation of its backstage area in order to convert it from an all counterweight house to a motorized rigging system. I. Weiss provided and installed 15 variable speed PowerLift® hoists (180 fpm, 1,250 lb. capacity) for scenery and electric sets. The hoists are controlled by a SceneControl® 500 rigging control system providing accurate, repeatable positioning, and load sensing. The console has 3D graphic views. PowerLift® and SceneControl® manufactured by J.R. Clancy.


iWeiss also installed a motorized brail-style fire curtain, a manual hand crank set, two counterweight sets and a pit filler, and outfitted five studios with pipe grids, tracks and curtains.


 

Locust Valley High School, NY

Multipurpose room used for theatrical performances, dance, and TV studio work. iWeiss intalled a pipe grid, stage curtains and rigging, and masking to cover mirror walls.

Premiere Exhibitions - Pipe Grids

We recently installed all of the Pipe Grids for a Premiere Exhibitions space for Saturday Night Live: The Exhibition.


See some press here on NBC.   If you visit, look up!

Broadcast Studio

We installed two pipe grids and two parallel running curved curtain tracks that run in front of a new chroma key cyc wall at a Broadcast Studio in Downtown Chicago.  The Blue and Grey velour curtains were provided and installed to use as alternate backgrounds from the chroma key cyc.

Augustana College

Augustana College's Department of Theatre Arts in Rock Island, IL recently received a full upgrade to its Thrust and Loft Theaters that includes iWeiss drapery and rigging equipment.  Working together with Hodge Construction, Theatrical Consultant Bill Conner Associates and BLDD Architects iWeiss ETCP certified project manager Russ Dusek was able to run the project smoothly out of our office in Chicago. 


Due to the lack of fly space, the Main Curtain is a Venetian style to allow the curtain to disappear fully out of sight.  The curtain operates on a line-shaft hoist that was fully fabricated in our shop in New Jersey along with the controls.


A pipe grid was installed over the thrust portion of the stage, along with a new lighting rail along three sides.  The stage also received all new battens and curtain tracks, along with eight roto drapers with Black Encore drapery, two tormentors, light ladders, new valances, a rear curtain, cyclorama and legs. The install was made all the more challenging since the building structure over the stage sloped dramatically from downstage to upstage.


The smaller Loft Theatre on the second floor received new lighting positions and variable perimeter tracks and drapery.